110kV Substation Project Case | Industrial Power Distribution System in Uzbekistan

110kV Power Substation Project in Uzbekistan-s.jpg


1. Project Overview

This project involves the construction of a new 110kV substation in an industrial park in Uzbekistan, aimed at meeting the rapidly growing power demand and improving the reliability of the regional power grid.

The substation adopts a 110/35kV voltage configuration with an outdoor AIS (Air Insulated Substation) design. The scope covers high-voltage switchgear, metering systems, protection and control systems, and a complete grounding network.

Project scope includes:

· Construction of 110kV substation system

· Installation of high-voltage equipment (SF6 circuit breakers, disconnect switches, etc.)

· Busbar system installation

· Protection and automation system integration

· System commissioning and energization

 

2. Why the Client Chose Us

During the supplier selection phase, the client evaluated multiple vendors based on:

· Equipment reliability and service life

· Experience in 110kV substation projects

· Technical support and installation capability

· Delivery time control

· After-sales service responsiveness

Eberry Electric was selected due to:

· Proven experience in high-voltage substation projects

· Comprehensive MV & HV product portfolio

· Integrated support from supply to installation guidance

· Fast and professional engineering response

 

3. Project Execution

Technical Alignment

After project confirmation, both parties completed technical parameter verification and optimized the system design to ensure compatibility with site conditions.

Manufacturing & Quality Control

Strict quality control was implemented during production, including:

· Mechanical performance testing

· Insulation level verification

· Withstand voltage testing

· Pre-delivery inspection

All equipment was thoroughly tested before shipment to ensure smooth on-site installation.

Installation & Commissioning

Upon delivery, technical support was provided to assist with:

· Equipment positioning and installation

· Busbar connection

· Secondary wiring

· System commissioning

 

4. Challenges and Solutions

Challenge 1: Limited Installation Space

Due to site constraints, equipment installation and lifting operations were complex.

Solution:
Optimized equipment layout and adopted modular installation methods to improve efficiency.

 

Challenge 2: Tight Project Schedule

The client required a strict and fast delivery timeline.

Solution:

· Prioritized key equipment production

· Optimized logistics planning

· Coordinated installation and commissioning in parallel

The project milestones were completed on schedule.

 

Challenge 3: Signal Instability During Commissioning

Some protection signals showed instability during system testing.

Solution:

· Remote technical diagnostics

· On-site wiring inspection guidance

· Control logic and parameter optimization

· We dispatched two technical engineers to the project site for on-site commissioning. The issue was fully resolved, and the system returned to normal operation within one week.

 

5. Post-Delivery Support

During the initial operation phase, the client encountered minor issues related to system operation and monitoring.

We provided:

· Remote technical support

· Operation guidance and training

· Parameter adjustment assistance

This ensured a smooth transition to stable operation.

 

6. Client Feedback

The client expressed high satisfaction with the project:

· Stable equipment performance

· Smooth installation process

· On-time delivery

· Responsive and professional technical support

 

7. Current Project Status

The 110kV substation is now operating reliably, providing continuous and stable power supply to the industrial park.

It has significantly improved:

· Power supply capacity

· Grid stability

· Operational reliability for industrial users

 

8. Conclusion

This project demonstrates Eberry Electric’s capability in delivering complete high-voltage power solutions, from equipment supply to successful commissioning.

With reliable products, professional support, and efficient execution, we ensure the successful implementation of substation projects worldwide


Related tags:

RELATED CASES

No search results found!
Contact Us

Phone: +8613736779975

E-mail: sales@vcbbreaker.com

Address: 66 Punan Road, Yueqing Economic Development Zone, Zhejiang, China

New energy: www.prominentcn.com

Copyright ©  2025 Eberry Electric Group  All rights reserved

Sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject